Wiring Progress..
Jul 19, 2011 update on vangoughv's 1970 Triumph GT6+ (Brutus)
The garage was a good place to be in the heat of the day so I managed to make some ground on the wiring. The main/middle panel is sorted out, gauges & switches mounted and everything tied to a nice 12wire harness I picked up for a wopping Buck .89, sweet deal, I picked up a few at that price.. Oil pressure gauge, volt meter gauge, new brake switch are all in and connected. I was able to roll the engine over with the touch of a switch for the first time….
All 1970 Triumph GT6+ (Brutus) updates
Prepping for engine assembly..
Pumpkin Festival Cinderella Car Show
Driveable... Let the fun begin
Wiring Progress..
Picked up my new trailer June 1
Installed the Rocker and Rear Quarter Dogleg
Cage is in, back to some body work...
Aluminum for Door and Dash Skins
Oil Pan & Timing Cover Looking Good
Oil Pan & Timing Cover Clean Up
Running, Brake & Turn Restored...
Bonnet almost ready for finishing
Interior Painted Ready for Cage
Starting into the roll cage last night...
Cleaned and sealed floor & under body tonight

