Straightening Up Our 2002
Jul 21, 2011 update to the BMW 2002tii project car
Before our car gets its finishing bodywork and final coats of paint, the guys at The Body Werks are double-checking its straightness using a frame machine. The machine holds the car perfectly still and creates a reference point to measure lengths, distances and widths of certain areas.
Our car was found to be slightly ‘off’ in the nose area—the left side was 7mm lower than the right, and this discrepancy was in the sheet metal—not the frame rail. Tom Prescott used the CarBench hydraulic arms to pull the car back into alignment. Now the final sheet metal fitting should go well.
All 1972 BMW 2002tii updates
Straightening Up Our 2002
Paint Jail: Out of Solitary and Into Gen Pop
Blocking Out Our Box, Part Deux
Blocking Out Our Box, Part Three
More Reassembly: 2002 Comes Together
Shiny Bits for our BMW 2002tii
Headline: 2002 Gets a Headliner
2002 Progress, Now With Lights and More
Project 2002: Wrapping Up the Trim
Project 2002: Brakes and Bottom End
Project 2002: Sorting out the wiring
Project 2002Tii: Console Ourselves
Project 2002Tii: Xmas Xtravaganza
Project 2002: Changing Wheel Color
Project 2002tii: Limited-Slip Differentials
Project 2002: Street Prepared Preparation
Comments
-
Jul 23, 2011 9:13 a.m.Pete240Z:
- I am excited. Put me at the top of the list when you are ready to sell. I was an idiot to pass on that 240Z.

